
Berthing
During the winter most boats are either hauled out or laid up in a mud berth. Space for either is limited and application must be made to the Berthing Master.
Each boat that is to be hauled out has to have an appropriately constructed trolley. These trolleys are usually made from lorry axles and steel work.
There are three slipways, two winches and a tractor. Use of the slipways, winches and tractor must be pre-booked as only trained club members are insured to use this machinery. A jet wash is also available to scrub off.
Hauled out berths Area per m2 x £9.50
West Berths Area per m2 x £6.50
East Beach Area per m2 x £8.00
Lighters Area per m2 x £6.00
Covered Accommodation Area per m2 per week x £1.00
Large Dinghies over 10ft and up to 16ft £75.00 per annum
Small Dinghies up to and including 10ft £55 per annum
Dry Dock £20.00 per week
